Projects
Slider

Back to Projects

High School Road


  • Location

    Poseyville, IN

Posey (IN)
25’-6” span x 5’0” rise concrete bridge
Aluminum box culvert, Structure Number 68 (24’-9” span x 5’-4” rise)
CivilCon provided comprehensive professional services for this project that included site survey, demolition of the existing structure, excavation for the new structure, geotechnical design, permitting, and roadway design, along with construction plans and structure details. CivilCon completed the hydraulic and hydrologic analysis to ensure that the proposed structure’s performance would be sustainable to the conditions.